Frontenac Engineering
314-644-2200

Visitation Academy

Frontenac Engineering provided the Civil Engineering for parking and traffic improvements on Visitation Academy’s 30 acre property. The project includes a 200-vehicle parking lot, a 50 vehicle parking lot and a new loop drive to circulate traffic around the site. The improvements utilized porous asphalt and bio retention to meet MSD standards for water quality. Two underground detention facilities were designed to mitigate the proposed improvements. Frontenac Engineering coordinated approvals from MoDOT, MSD and the city of Town & Country.

Services Provided:

Civil Engineering, Site Development plan, Land Surveying

 


Fatal error: Uncaught exception 'phpmailerException' with message 'Invalid address: (setFrom) fe-stl.com' in /data/21/4/129/8/4292823/user/4902112/htdocs/wp-includes/class-phpmailer.php:1023 Stack trace: #0 /data/21/4/129/8/4292823/user/4902112/htdocs/wp-includes/pluggable.php(352): PHPMailer->setFrom('fe-stl.com', 'WordPress', false) #1 /data/21/4/129/8/4292823/user/4902112/htdocs/wp-content/plugins/mail-on-update/mail-on-update.php(179): wp_mail('kathyw@fe-stl.c...', '[Frontenac Engi...', 'A new version o...', 'From: WordPress...') #2 [internal function]: MailOnUpdate->checkPlugins('') #3 /data/21/4/129/8/4292823/user/4902112/htdocs/wp-includes/class-wp-hook.php(298): call_user_func_array(Array, Array) #4 /data/21/4/129/8/4292823/user/4902112/htdocs/wp-includes/class-wp-hook.php(323): WP_Hook->apply_filters('', Array) #5 /data/21/4/129/8/4292823/user/4902112/htdocs/wp-includes/plugin.php(453): WP_Hook->do_action(Array) #6 /data/21/4/129/8/4292823/user/4902112/htdocs/wp-includes/general-template.php(2590): do_action('wp in /data/21/4/129/8/4292823/user/4902112/htdocs/wp-includes/class-phpmailer.php on line 1023